联系我们 | 免费报价 | 越南工厂出租和工业园区
Trang Due Industrial Park planned with a total area of 600 ha construction in the model of a modern architectural ensemble includes: Industrial Park - Urban - The entertainment and services.
The project is divided into 2 parts:
- 400 ha Industrial Park consists of 2 phases:
Phase 1: 200 ha (industrial land)
Phase 2: 200 ha (industrial land)
- Urban Services 200 ha
×close
高速公路 | 4 lanes | 废水处理 | 1,500 m³/day | ||
---|---|---|---|---|---|
工业用水 | 20,000 m³/day | 雨水处理 | |||
电力 | 80MVA | 天然气 | |||
电话 | 安全 | 24-hour security guard | |||
管理费 | 0.5 USD/m² | 评论 |
* There are Japanese companies * Rental factory available (building area: 4,000 / 6,000 m2, floor load capacity: 1.0 t / m2) |
从 Ho Chi Minh City | 110km | 从 Tan Son Nhat International Airport | 134km |
---|---|---|---|
从 Long Thanh International Airport | 6km | 从 New Saigon Port | 15km |
从 Cat Lai Port | 20km | 从 Thi Vai Port | 65km |
从 Vung Tau Port |
请通过此表格发送询问。 根据您的位置、面积、目的、日程安排等要求,我们免费为您提供选择!
请确认您的询问并点击“发送”按钮。