联系我们 | 免费报价 | 越南工厂出租和工业园区
Phu My 2 expansion industrial park has internal port system which can receive vessel, barges of up to 3,000 tons, advantages in transportation of the domestic materials and goods...
For inland transportation, it connects to the Southeastern provinces and Southern key economic region via Road Route 965 and National Highway 51. These roads have been completely invested to serve the needs of trade, transportation, materials, goods, etc…
The technical infrastructure system of the Industrial zone planned and invested in synchronous construction including the internal road traffic system, power supply, water supply, storm-water drainage, wastewater drainage, wastewater treatment system.
×close
高速公路 | 2 lanes | 废水处理 | 10,000 m3/day | ||
---|---|---|---|---|---|
工业用水 | 20,000 m3/day | 雨水处理 | |||
电力 | 110 / 22 KV | 天然气 | |||
电话 | 安全 | 24-hour security guard | |||
管理费 | 0.5 USD/m² | 评论 |
从 Ho Chi Minh City | 55km | 从 Tan Son Nhat International Airport | 63km |
---|---|---|---|
从 Long Thanh International Airport | 26km | 从 New Saigon Port | 54km |
从 Cat Lai Port | 49km | 从 Thi Vai Port | 4km |
从 Vung Tau Port | 40km |
请通过此表格发送询问。 根据您的位置、面积、目的、日程安排等要求,我们免费为您提供选择!
请确认您的询问并点击“发送”按钮。