联系我们 | 免费报价 | 越南工厂出租和工业园区
Phuc Long Industrial Park has already made well geological survey when geological drilling for each lot with the depth of hard soil from 10 m - 28m. Now many factories of heavy industry was born in Phuc Long Industrial Park.
+ Ready to receive investment projects:
+ Smooth and fill up in accordance with altitude rule.
+ Finished infrastructure: transport system, power supply system, water supply system, wastewater treatment system, fire fighting system, trees, environmental protection, etc , helping investor to construct fast and starting manufacture
×close
高速公路 | 2 lanes | 废水处理 | 1300 m3/day | ||
---|---|---|---|---|---|
工业用水 | 7200 m3/day | 雨水处理 | |||
电力 | 110 MVA (2 systems 110/22 KV) | 天然气 | |||
电话 | 安全 | 24時間常駐警備 | |||
管理费 | 0.4 USD/m² | 评论 |
* There are Japanese companies * Build factories according to customer needs * Rental factory available: Floor load capacity 3.0 t / m2 |
从 Ho Chi Minh City | 31km | 从 Tan Son Nhat International Airport | 32km |
---|---|---|---|
从 Long Thanh International Airport | 64km | 从 New Saigon Port | 37km |
从 Cat Lai Port | 39km | 从 Thi Vai Port | 86km |
从 Vung Tau Port | 119km |
请通过此表格发送询问。 根据您的位置、面积、目的、日程安排等要求,我们免费为您提供选择!
请确认您的询问并点击“发送”按钮。